Safety code for mill-turn?


Bob W.
 Share

Recommended Posts

I'm still in the process of getting our new mill turn (DMG-MORI NTX2000) dialed and I was curious what others typically include in their safety code line.  Things like putting the machine in inch mode, X-Y plane, cancel cutter comp, cancel TCP, absolute mode, etc...  I would love to hear what people consider to be a must in the mill-turn program header to make sure the machine will not kick off a program in some crazy mode.  I figure by December we will really have this humming along.

I guess another aspect of this is what would be the specific differences in the safety code for upper and lower turret programs.

Link to comment
Share on other sites
2 hours ago, Bob W. said:

I'm still in the process of getting our new mill turn (DMG-MORI NTX2000) dialed and I was curious what others typically include in their safety code line.  Things like putting the machine in inch mode, X-Y plane, cancel cutter comp, cancel TCP, absolute mode, etc...  I would love to hear what people consider to be a must in the mill-turn program header to make sure the machine will not kick off a program in some crazy mode.  I figure by December we will really have this humming along.

I guess another aspect of this is what would be the specific differences in the safety code for upper and lower turret programs.

Bob typical sync codes Cancel codes. Other than that really going to come down to the type of work you are doing. Bar work with a feeder is one method, Part Piece, Fixture mounted, transfer, double transfer or triple transfer and then starting the right and transferring back to the left. Will you be doing a lot of pinch milling and pinch turning? Material not as much of a consideration, but material will have some part in how you go about your process. I think you are looking at it correctly, I went into one place years ago and after about 9 months of struggles I got their 3 MULTUS machines up and running, but it took about 6 months of getting all the parts they wanted programmed and proven out. They hired someone for internal control and I moved on to other machines and areas.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...