Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

Actual machine time?


Brendan P
 Share

Recommended Posts

When I backplot a lathe file,at the bottom of my screen,it will say "Machining time 10 minutes,25 seconds".

Then it says,"Please use set up sheet to get specific time estimate".

 

Is the time that the backplot gives you not very accurate?

And also,I have gone to the "setup sheet" and cannot find any machine times in there,

WTH am I missing. frown.gif

If there is times in the set up sheet,please explain to me how to find them.

 

thank you in advance wink.gif

Link to comment
Share on other sites

When discussing Setup Sheets, you need to let everyone know WHICH setup sheet generator you are talking about ->

 

1> the Graphic setup sheet option in MC

2> the .SET (post type) setup sheet option in MC

3> the HTML Setup Sheet (from In-House Solutions)

 

The .SET type setup sheet generators for LATHE that shipped with MC v9+ DO output times ->

 

(for each tool ->)

Time for tool 2: 0 hours, 1 minutes, 24 seconds

 

(and program total ->)

Total time: 0 hours, 34 minutes, 41 seconds

Link to comment
Share on other sites

I must be talking about the grafic set up sheet.

op. manager/options/set up sheet.

This is where I am going to look for the times.

Is this not right?

 

How do you use the .set set up sheet?

 

sorry for not being specific,I didn't know there was a difference.

I am using v9.1

Link to comment
Share on other sites

Screen -> Configure -> NC Setting(tab)

Look in the middle-right of the dialog for...

 

Setup Sheet

* Post (uses .SET file)

* Using Graphical Interface

 

If you select '.SET' type, you can specify the Setup Sheet template file (the .SET) under the Files (tab), look under File Usage and highlight 'Setup Sheet Template'. Now look below in the File name text box for the the ?.SET filename.

Link to comment
Share on other sites

Bucket, note that you will need to specify the rapid and tool change times in your .set to get more accurate readings.

 

:edit:

This is from Mill2.set:

 

code:

# Specific setting to allow tuning the cycle time calculations ->

 

# Set the time it takes for machine to do a toolchange ->

tlchgtime : .1 # Tool Change Time (* in Minutes *)

 

# Set the Rapid Traverse Rate of the machine

38. Rapid feedrate (Inches per Minute)? 400.0

1538. Rapid feedrate (MM per Minute)? 10000.0

#These values are loaded into the pre-defined post variable -> pst_rpd_fr (v9)

:/edit:

 

'Rekd

 

[ 08-04-2003, 12:10 PM: Message edited by: Rekd ]

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...