Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

Jonatt

Members
  • Posts

    2
  • Joined

  • Last visited

Posts posted by Jonatt

  1. On 7/20/2021 at 4:43 PM, Colin Gilchrist said:

    By default; all of the Moduleworks 5X Paths only use "First Lead In", and "Last Lead Out".

    You have to enable the "lead in/out" option, on the Default Links, Small/Large Gap settings.

    What is a "Gap" in Mastercam?

    > A "Gap" is any break in the toolpath motion. It can be "between passes", it can be "end of last pass > to start of next pass", or it can be a "physical break" in the path, like a hole in the surface.

    With the MW paths, you have a setting that lets you "set the gap distance", either as a percentage of Tool Diameter, or as a physical distance. I prefer to use the "distance" setting, when playing around with motion. That way I know where the delineation is between "small gap" and "large gap".

    5X Morph - default [first-last] lead in-out only.PNG

    5X default lead in-out for Moduleworks Paths.PNG

    5X large-gap lead in-out for Moduleworks Paths.PNGwww.worktime.com

    5X Morph - large gap lead in-out enabled.PNG

    I quoted this, so you get notified...

    It's very cool!!! 

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...