Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

robh

Verified Members
  • Posts

    202
  • Joined

  • Last visited

Posts posted by robh

  1. quote:

    Dave, I have showed management at one company I worked for a job that had over 1000 hours in it had a shop rate of $9.17 hour when were suppose to be be getting $125/hr. I was told to shut my mouth and not to do that again. I was the shop foreman so what does that tell you?

     


    Do not know how to do multiple quotes, because I'd like to add alot of them to this post, Dave sometimes owners just do not listen to ppl they count on because of ???that's why the" pie in the sky, throwing good money after bad"and so on keep happening..I wish you well in your business, believe me, but Ron's "spot on " with his assesment of how "some" run there shops.

  2. have you tried clamping those 4 parts in one vise? I've found that unless your stock is perfectly dimensioned, more than two parts per vise and parts start getting thrown or pulled by the tools, even with two, measuring each may be necessary to avoid it..you can program the two parts with one work offset if you only have G54-G59 or E1-E8, if you have G54.1P1-P48 or whatever you can assign each part its own WO.HTH

  3. over on the coast,we unually just get 76 MAROK 150 from our local distributor along w/ air oil and other asst. lubricants.I've got a machine lubricant cross reference pdf if anyone needs one.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...