-
Posts
2 -
Joined
-
Last visited
Content Type
Profiles
Forums
Downloads
Store
eMastercam Wiki
Blogs
Gallery
Events
Posts posted by Eudorian81
-
-
I know this post has been cold since September but we had a situation in Mastercam Lathe where an already programmed part had to switch to a different lathe for Op2 which was not originally planned. We created a second machine group in the same file but the stock flip would not work properly so we had to reprogram the second op using a different WCS. Is there a way to push the stock flip op from one machine group to another? We then tried to copy the paths down to the new group but could not get them to switch wcs or tool plane. Is there a setting or something we were doing wrong? Any help would be appreciated.
ps. We did not create two files due to configuration control at our company.
changing WCS in lathe
in Industrial Forum
Posted
Thanks, I'm glad that I finally joined emastercam. There is a huge amount of info here.
About my lathe question, thanks for the help, I didn't think to push the entire program to the new machine group and ghost the excess but that is a good idea. This is my 4th week using MC lathe so I'm green in that department.
Is there a way to import a stock model into Lathe? ( .stl , .stp/.step, or .x_t)