Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.
Use your display name or email address to sign in:
Hi, everybody,
I tried "Z then G28" but all the spindle got sent home. How do I avoid moving the table where I just want my Z axis to go up in the most effection manner?
The reason I asked this is I have quite a few tools to set length so I would like to see the Z axis go up without moving the table so that I can set the length for the following tools quickly.
Please advice. I am still a beginner in CNC machine!
Thanks, folks. Thank you for your help. I still have a question:
Is it better to use two-flute over four-flute? Do I need to use high helix cutter or a regular endmill??
I do use lots of conventional milling and side milling and just the burrs in the corners are all welded to the piece... Trouble!
Thanks for the tips. I do use Brand New cutter and "climb mill" a few tiems before I reached the finishing size. However, the burr is so heavy that I cann't use any traditional method to remove it (from heavy material removal).
Question: may I send nylon on the sending disc??
How do I prevent the workpiece get gummy even I apply constant coolant??
Please advice. Thanks
Hello, is there any way to sent the spindle home (without homing the table) after set the tool length on the Haas machine? I use manual Z level .1 to go up but there must be a way to simplify this. Please help. Thanks
Hello, what is the best deburrring tools for nylons? I found the burrs from heavy roughing is hard to remove and once it is deburred the part does not look neat at all. Please advice.
Thank you for your help, CrazyMillMan, Frank, Cadist. Thank you so so much!! This is a great help for me! I use Haas VF-2 with Fanuc control. Sometimes I use LeadWell and Fadal machine (both with Fanuc control). What should I pay special attention to on these machines??
What is R plane??? Please explain! Thanks
Hello, which command do I use if I have two holes (on different hight) to be drilled by the same drill? Or, we just set it up on machine according to the hights of the part?? Please help. Thank you.
eMastercam - your online source for all things Mastercam.
Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.