Hey All,

 

Looked in the manual & help, did a search but couldn't find an answer...

 

Is it possible to change comp from off to on between chains on an Op in the Chain Manager?

 

Right click brings up a context menu that has "Change at point..." with Cutter Comp at the top. It appears that I should be able to turn it on/off here but I can't get it to work.

 

I also noticed that this "Change at point" seems to differ from the "Drill change at point"...is this correct?

 

Thanks,

 

John

Link to comment
Share on other sites

Right now, that's exactly what I'm doing, however:

 

When using multiple Ops in a Transform that creates multiple copies, it does not do them in the best sequence.

 

For example: An Op with 3 chains, 1 chain no comp, 2 chains with comp.

 

Transforming this single Op would machine all 3 chains on each copy before moving to the next.

 

Since I can't figure out how to properly apply the "Change at point", I create two Ops, one with a single no comp chain and one with two comp'd chains. My Transform then executes the one no comp Op on all copies, then starts over and executes the comp'd Op on all copies...wasted time & moves.

 

Anybody??? confused.gif

 

Thanks,

 

John

Link to comment
Share on other sites

quote:

For example: An Op with 3 chains, 1 chain no comp, 2 chains with comp.


John,

 

I don't believe there is a way to do this. In the tool parameters you define if a particular op has comp or not. I don't think you can then change some of them to do something else. I'm pretty sure you'll h ave to chain you non-comped stuff seperate of your comp stuff.

 

BTW, you can set the order of your ops in transform by using the operation order/operation type options

Link to comment
Share on other sites

John:

 

There are two way to do this.

 

1. In your transform operatiojn select the two operations (one comped and one not comped) the use toolpanes and operation order.

 

2. Use the tool path editor. Right click on your operation and go to the point you want the comp turned off and select edit point and turn off comp.

 

HTH

Link to comment
Share on other sites

That explains it...I'm still on X SP1.003. I tried MR1 and found that ctrl-click no longer worked to select/deselect individual Ops in the Operations Manager. As I do this a lot, I decided to wait for the next update. I found this same problem with MR1 SP2 that I received from our dealer.

 

Have you run into this ctrl-click issue, and if so how did you get around it?

 

John

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...