Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

Guyinthedesert

Verified Members
  • Posts

    376
  • Joined

  • Last visited

Posts posted by Guyinthedesert

  1. I find myself needing to program an old 5T lathe. This control doesn't  use decimal points, so you would enter 1" as 10000.  I'm using X5 with the Generic Fanuc 2X lathe post. 

     

    The control def was set to use R for arcs. I changed the format statements for X Y Z I J K and R to #16, which is for no decimals w/ 4 places, and it posted just how I wanted.

     

    However, the 5T doesn't use R's. So I changed the control def to use IK. But the post outputs I and K with decimal points. Is there somewhere else I need to change something?

     

    TIA

     

  2. Just machined tubes. )

    The application can be very broad.

    We do a few tubes here. Always a lot of fun. Most of the ones we do are just straight tubes w/ grooves on the end and a kink somewhere around the middle.

     

    It always cracks me up, as someone always goes off about how they could turn the whole thing complete.

  3. I've seen this on a couple new Haas's. When running a program with a long cycle time, the screen saver kicks in and shuts the monitor off. But on a few instances, the screen would not come back on. Everything worked fine, you could put it in handwheel mode and move it around. But I had to shut the control off and turn it back on.

  4. one thing we do on regular repeat jobs is all the tools are dedicated. All you have to do is slap them in and hit go. That saves a ton of time on setups. The other thing is detailed set up sheets, but not too detailed.

     

    Unfortunately, no matter how much time you shave off a setup, the setup guy will still have to spend 2 hours trying to find a 3/8 allen wrench. When he does manage to get a f/a  in between bathroom and cigarette breaks, it'll just sit on the incoming shelf in inspection for half a day, while our inspection staff is standing outside arguing about who's turn it is to drive over to Jersey Mikes.

     

    Sometimes it seems like a lost cause.

    • Like 1
  5. okuma mill 32 tool changer  I did not mention its only a .125 slot,, 9 inch dia.  I'm not milling a complete round diameter

    thanks for the help

    So, is the 9" dia round?  if so you can just trepan it the same as you would an o-ring groove. Obviously, you would need to hand load the tool. It would be no problem with a 50 taper. With a 40 taper, you may need to lighten it up.

  6. We have a few jobs that are considered "Filler" jobs. When a machine has nothing scheduled on it, we'll throw a filler job into it and keep it running weather there are orders for the part or not. They go into stock, and when they get ordered, they ship.

     

    So, if I'm understanding this right, under lean manufacturing, we would be money ahead to just shut the machines off and tell the operators to grab a broom?

  7. 95% of our work, if I get a model, it's reference only and the paper print takes precedence. And No, the supplied reference models are never right.

     

    The other 5% are reduced dimension drawings, and the model takes precedence, however it needs to be spelled out in black and white that you go by the model.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...