Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.
Use your display name or email address to sign in:
We have dozens of 1/4" drills and a premier account with Garr Tool. If you need it to get the job done. We will buy it. You can't be cheap with your employee's or your tool's if you expect to make a quality product.
Our Christmas party was great with a full dinner, open bar and Bounus checks. We all went home fat and happy. Life is good on this side of the country. Make the move.
I am looking for a level 3 programer. We make blades and vanes. Send me an e-mail.
[email protected]
Carey Linkovich
Engineering Manager
BNB Manufacturing Co.,Inc.
200 Price Rd.
Winsted, CT 06098
www.bnbmfgco.com
Thanks Rob,
For the right candidate, compensation is very good. People off the street seem to lack experience in MC. Is everyone working again?
Here is our web site address.
www.bnbmfgco.com
Looking for a Process Engineer/CNC Programmer in Winsted, CT 06098
CNC Process Engineer: 3-D modeling and 3-5 axis programming for milling. Production experience with airfoils, impeller, blisk and other parts for turbine engines with an emphasis on 3-5 axis complex surfaced parts machine programming is a plus.
email resume
[email protected]
Does anyone here have experience with Camaix USA
Industrial Technology Development.
We are getting our first 5 axis machine and will be doing some complex Blisk parts. It runs inside Mastercam.
Thanks in advance.
Too many bugs to use -X-. Post processors did not convert. Subprograms do call correctly. Even with SP1. More mouse cliks for the same process. Editing and turning switches on for debug in posts. NG. Post is now a compiled program. Not very nice. Editor has line numbers. Why? I looks like we will wait again to see what service pack 2 brings.
I have been having this problem for a long time. I have found that, if I turn down the quality of the verify so low it is not very helpful. The verify program will run complete most of the time.
Matt, Thanks for the tip. I have removed the verify.prm file. The system regenerates the file when you run verify. I will see if the problem goes away. Possible that file gets corrupt.
I have found -X- to be unusable for my applications until the program number for subs is put back in the operations manager. Right now it is nothing more than a toy for when I have free time. Opps, thats never. I hope SP1 gets here soon.
This is really ugly for us.
We write complicated programs with hundreds of operations. Our posts have been written and re-written over the years to generate a new subroutine by program number for each operation. It would be impossible to find a minor program glitch if we only used one program and a duanting task to change the machine group for each operation and regenerate.
Please bring back the program number capability.
eMastercam - your online source for all things Mastercam.
Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.