  1. Ah okay.  That's what I meant earlier when I said it could be figured out with some trigonometry.  I should have known someone had already done the math and made it into a simple equation.  Thanks for clearing that up.  I'll definitely keep that constant handy.

     

    After a little more thought and research the formula that should work is take your tip dia. + your tip offset X 2 and use that for your diameter.

     

    So on a half inch hole with a 1/4 chamfer mill with a .06 tip amd .03 tip offset you would have:

     

      .06 (tip dia. in tool definition)  +.06 ( tip offset x2 )= .120

    .500 -.12 = .38 / 2 = .190 * .4142 = 0.078698

     

    That in your line  and arc with 135 sweep will hit the center of the arc. Tried it for 3 different tools and worked for each.

  2.  

    Hello, We recently purchased a Haas Mini Mill and a HA5C A axis rotary.
    Im not familiar programming the A axis and was hoping you could send me a sample program to go off of.
    Basically going to have several plastic rings on a mandral and need notched ever 45 deg.  So I need the A axis to start at 0 deg, stop, then going to make a pass in the X, retract, index 45 deg, make a pass in the X, and so on, 8 times.  So there will be 8 cuts (360 deg) spaced 45 deg from each other.
    Thanks for the help and please email me back for questions if I didn't explain this very well.
     
    Paul Felger  

     

     

     

    Simple. Post out your program and with a little manual editing no problem. Haas using an A axis just add another address to your X and Y line whatever you want to be at. Cutter comp off. Lead in lead out line only no arc.

     

    Original output using 3 axis post.

     

    G0 G17 G40 G49 G80 G90

    ( 0.125 CHAMFER MILL )

    T1 M6

    G0 G54 G90 X.0625 Y0. S6000 M3

    G43 H1 Z.1

    M8

    G1 Z-.03 F30.

    X0.

    X-1.4313

    X-1.4938

    G0 Z.1

    M9

    M5

    G28 G91 Z0.

    G0 G53 G90 Y0.

    M30

     

    Modify first line for A axis

     

    G0 G17 G40 G49 G80 G90

    ( 0.125 CHAMFER MILL )

    T1 M6

    G0 G54 G90 X.0625 Y0. A0 S6000 M3

    G43 H1 Z.1

    M8

    G1 Z-.03 F30.

    X0.

    X-1.4313

    X-1.4938

    G0 Z.1

    M9

    M5

    G28 G91 Z0.

    G0 G53 G90 Y0.

    M30

     

    Copy and paste and edit to do more passes.

    G0 G17 G40 G49 G80 G90

    ( 0.125 CHAMFER MILL )

    T1 M6

    G0 G54 G90 X.0625 Y0. A0 S6000 M3

    G43 H1 Z.1

    M8

    G1 Z-.03 F30.

    X0.

    X-1.4313

    X-1.4938

    G0 Z.1

     

     X.0625 Y0. A45.

    G1 Z-.03 F30.

    X0.

    X-1.4313

    X-1.4938

    G0 Z.1

     

     X.0625 Y0. A90.

    G1 Z-.03 F30.

    X0.

    X-1.4313

    X-1.4938

    G0 Z.1

     

     X.0625 Y0. A135.

    G43 H1 Z.1

    M8

    G1 Z-.03 F30.

    X0.

    X-1.4313

    X-1.4938

    G0 Z.1

    M9

    M5

    G28 G91 Z0.

    G0 G53 G90 Y0.

    M30

     

    And on around till done. Don't forget the decimal point after A address or you will only get a percentage of a degree. A90. will be 90 degrees A90 will be .9 of one degree.

     

    Edit: Noticed the Solidcam addition to subject if Mod wants to delete thats fine with me.

  3.  

    Well, I don't know where ".4142" comes from or where you want me to put that information.  But I could use the equation (hole size - tool diameter) / 2 if I were just using an entry line with no arc.  But I want to use an arc.

     

     

    It's a formula that some one figured out a long time ago. The only thing Jeff forgot was a 135 degree sweep for angle . So for a .737 hole using a 3/8 endmill it's .737-.375 =.362 / 2 = .181*.4142 = .0749702. That is your lead in lead out for line and arc with a 135 sweep you will always go to center of a hole. Also handy for slots and a few other things where your sweep is tight. A little math for a 45 and you can bang it right on center or at least within a minuscule amount that your operators should be comfortable.

     

     

    post-12785-0-86862200-1476803147_thumb.png

     

     

    post-12785-0-33739700-1476803147_thumb.png

    • Like 2
  4. Mill guy now for many years but I did a bunch of manual lathe stuff back a ways ( not saying how far back). So long as you don't hit the ways it's good to go. Might need some special jaws for holding or something and pay attention to your spindle speed. Did a lot of funky stuff. Here is one I did . Leveled it up. Chucked it in and clamped on some counter weights. Was for a 600 ton crane. Weighed I think around 600 lbs. Cleared the ways by thousandths lol.

     

     

    post-12785-0-12852800-1476719264_thumb.jpg

     

    post-12785-0-32022100-1476719273_thumb.jpg

    • Like 1
  5. Is there a way to ONLY show the WCS datum lines when you hit F9? Right now it shows the System Origin lines in default brown, and the WCS in light blue. That gets consufing to my operators when it's a setup sheet in Black and White.

     

     

    No. A workaround when you go to print a setup sheet is to change the system origin color to the same as your background. This will "hide" it while you print out a setup sheet. A small pain but will save you the headaches of your operators being confused.

     

    Edit: The other thing I used to do is create a quick note with a single leader. F9 to hide the origins and then print. Can put your notes on different level or just blank them so the are hidden.

     

    post-12785-0-23666600-1475761711_thumb.png

     

    Edit #2: John beat me to it. :thumbsup:

  6. But the default WCS can't be altered, correct?

    Most of the time we use 1/8" oversize stock on the height, width and length and I put the datum at the edge of the stock and not the finished part for the 1st op, and then the edge of the part for the rest of the ops.

     

    Mastercam system origin cannot be moved but the WCS can. So here is a top using stock corner as WCS. You go to bottom. The small arrow used to allow you to pick a new WCS while the part stays tied to system origin. You now need to create a copy of the view then the arrow becomes active and you can choose a new WCS on the part anywhere. The part never moves from system origin so that when you verify you will get a complete part.

     

    post-12785-0-61677500-1475697330_thumb.png

     

    post-12785-0-06050700-1475697328_thumb.png

     

    post-12785-0-12461300-1475697327_thumb.png

    • Like 1
  7. Problem was the issues it created down the road to high end projects or programs that had many WCS in them. When the base Matrix was changed everything went south quick. By locking the base planes where all the math comes from you keep the math process more stable. When you change the start points on a system tied to them the system has a hard time correcting problems. By locking all base math calculations to a base matrix and going from there you are good to go. Like said create a CSV file of your planes and import them in if creating copies is giving you such heart burn. When I have a part with upwards of 40 to 100 WCS and several 100 operations I want it to work and since they have locked the base planes down issues I use to see are gone.  Not trying to be mean, but not all of use make simple prismatic parts on a 3 Axis machine. Even when I do I always created copies of my planes I never changed the bases planes. Seen to many issues doing that, I wanted a base reference was kind of hard if the base reference was gone.

     

    No worries I don't think your being mean. There are always 2 sides. I figured it had something to do with the solids needing to be locked in for one reason or another. Doesn't mean I have to like it.

  8. The first project they gave me when I started here

     

    6 weeks from design to program completion...the nature of the beast here

     

    5 separate Palletech Lines, each with a 50 pallet pool, things are set up to run for the long haul

     

    Edit: Oh and it's still running today for a year plus, 24/7, well, almost more like 22/6

     

    If I was closer John I would come work for you. Might make it fun again learning new stuff. I always want a job where I am the dumbest so I can learn and go to a new level. Unfortunately around here most shops are small job shops and the programmers are fair. Usually end up teaching many tricks and features of Mastercam to people.

     

    Edit: Oops. Now I'm the braggart. :stuart:

  9. Because I want to verify all ops at once to make sure I have everything correct.

    If i have every op on their own level using TOP as the WCS, I can't do that.  Unless I'm missing something.

     

    Yup your missing something lol. Only first op is top. After that I would use bottom, left, right, front and back. Was always able to select work origin in each with a mouse click. Now you have to copy the view to be able to select something other than Mastercam origin. All ops verify to make a complete part.

  10. Sheesh, it can take me a week just come up with a fixture method and then get it designed

     

    :)

     

    It's all about what we do...it's not often I see work as described above

     

     

    Braggart. :harhar::unworthy: 

     

    Job shops are usually vise or fixture held parts ( plate work ) most of the time. Do get some trickier parts that take a while to fixture but nothing that complicated. If I took a week to figure out a part I would be looking for a new job fast. It is all about what we do.

  11. This is the habit I'm trying REALLY hard to break, since I've been doing it this way since V9.

    Most of my parts are 1-2pcs so i try to spend as little time as I can on Mastercam for each part.

     

     

    I don't understand. Break this habit why? I can import a file orient it move it to origin and be programming in less than a minute. In many cases maybe 30 seconds and I am programming away.

  12. To rotate the part use dynamic xform. To rotate WCS, you will have to create one and rotate it. You can not modify TOP or any preset planes. If you need to edit a plane open plane manager and right click it.

     

    Realistically you can modify top by orienting the part the way you want op1 to be before you start. I use 3D translate and move part to origin. Unless your part comes in at some weird angle couple of clicks all done. Used to be able to have 6 ops and never have to create a plane. Now after first op have to copy everything so you can pick a part origin. Instead of a nice clean planes manager you now will have 8-12 planes for simple parts. Drives me nuts.

    • Like 1
  13. Still slogging along with it. Still find it very cumbersome and frustrating. So many things that I used to be able to do faster now take longer. Opening recent files is a pain. click on the down arrow hover pointer over folder icon and wait for drop down. Changing colors and levels right click no longer works. Escape key on some functions does not work any more. Planes manager starting in X9 to me is horrible. Used to be able to orient part in top view then use bottom, left, right, front and back for next ops being able to choose where origin is. Now have to create a copy before being able to select an origin other that system origin. The last 2 shops I have come into starting the milling departments and recommending Mastercam. Always have thought it was great and easy to use regardless of small bugs. In a program this huge you got to expect somethings to be missed. That being said I think I would have a hard time being adamant about Mastercam again. Would be much more willing to try a different Cam package than I was in the past. 

     

    JM2C

    • Like 1
  14. BOOM!

     

    Brian, write that MoFo up. Not for scrapping a part unless it's standard policy but for being a dumb@$$.

     

    He is the Trak guy here and been here longer than I have. Good guy to work with. Does some really nice work. But very opinionated on many things. Not even going to try and change his mind. Have to agree with the inspector from the customer though. I would never make a part like this. .067 is the UPPER limit. .0671 is oversize.

  15. Seen this on another forum and now I have run into it here. You have a hole say .066-.067. A .067 pin goes in the hole but an .068 does not. Guy says good. I say no good a .067 pin should not go. For sake of discussion we will assume an exact size not a plus or minus pin. I believe his thought is you get to use up to .0679 and it is still a .067 hole. Not bad till it actually goes to .068.