Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

shazam/TPP

Verified Members
  • Posts

    510
  • Joined

  • Last visited

Posts posted by shazam/TPP

  1. These 2 lines in MDI

     

    G40 G49

    G5.1 Q0

     

    That order works on one of our machines here. Something about canceling after the height offset is canceled IIRC

     

    the G49 before the G5.1 Q0 is this correct? i ask because the link sledgeek posted shows opposite

     

    Again, don't call in a drill or tap cycle.

    G05.1Q1 MUST be called before the G43 line.

    G05.1Q0 MUST be called to cancel it.

    G49 (tool height comp cancel) MUST be called after G05.1Q0. If you don't call G49, you cannot call/activate G05.1Q1 again (and the yellow books don't tell you this).

     

    is it the same for an 18iMB control? we received no training in this and the manual is ... well you know

  2. you could just do one as a txt file. go into your toolpaths, then tool manager, right click the tool file and import/export, convert tool a library to text and then view the format. then create your own txt file with the same format and import it back to mastercam. i have made mass edits to my current file this way.

  3. I guess is it possible to hire someone to build a post that every time it finds a tool change I can assign g54,g55,g56,g57 and so on witch would be a huge time saver.

     

    your re-seller should be able to help you with that. would you be able to attach a sample of what you're trying to do?

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...