Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.
Use your display name or email address to sign in:
Help Drawing lines . I have two point 120 inches apart. from these points i need to draw two lines different lengths which need to connect at there end points 1 line is 194 long and the other is 289 long . is there a way to draw this without figuring out the angles. I need to do this with a 100 different points so i was hoping for a quick way. I know the length of the three lines so i could trig. out the angle , but was hoping i didn't have to.
anyone having problem with the new update for X8 , mine wont start, invalid exe. did an uninstall and reinstall still have the same problem. restored my computer to an earlier date got x8 running again, then did the update again and it quit working again , same error invalid exe. any suggestions?
Yes Dave that was 1 of the problems, the other 1 is the r value needed to be 1.9 so then it would rapid .1 above the part drill the hole then rapid back up to the 2 " . drilling with Hurco is a little odd. but once we get the post the way we want then the problem is solved, cheers.
Dave do you run Hurco? for some reason with Hurco when drilling Z+ is into the part. also everything is incremental from where you start. so if you start .1 up in z you have to tell it drill .5 deep to get a hole .4 deep. maybe there is a machine parameter to change that i don't know about. but we have been running this way for a few years now. maybe some of the Hurco guys here have a different way to do this. dave this is the confusing part. you have to position Z to the staring height. so you would start Z @. 2 then your R would be .1 , then the machine would start drilling at .1 then retract to .2 to move to the next hole. I am open for suggestions if this is not right. Cheers
still having trouble with drill and tap cycles, can some look at this code and see if it looks right. z rapid to 2.0 , then to .1 ,then to z0. then it start to feed. we tried to set it the same as J paris said but it will still rapid right to z0.
(T) (MASTERCAM - X) (MCX FILE - T) (POST - ) (MATERIAL - ALUMINUM INCH - 2024) (PROGRAM - T.NC) (DATE - FEB-20-2015) (TIME - 11:03 AM) (POST DEV - IN-HOUSE SOLUTIONS) (T1 - 13/64 DRILL - H0 - D0 - D0.2031") N100 G70 G75 G90 N110 G00 T1 M06 (13/64 DRILL) N120 (MAX - Z2.) N130 (MIN - Z-.3) N140 G00 X0. Y0. N150 S2800 M03 N160 Z2. M08 N170 Z.1 N180 G81 Z.4 R.1 F8. N190 X.5 Z.4 N200 X1. Z.4 N210 G80 N220 Z2. N230 M09 N240 M05 N250 G00 M25 N260 M2 E
I need to change my post . when drilling holes I put a retract height of .5 to clear clamps when it goes to the next hole it starts drilling .5 above the part. is this a post issue or is it the way I set my retracts?
taking the level 1 course right now, have already learned allot of new stuff. I guess it doesn't hurt to start from the beginning . not as smart as I thought i was.lol
I have had this problem a few time posting with x8 lathe. when i select all the operation to post it will only post the first operation. any help would be appreciated.
Jay I have X8 mill level 2 with solids , so should i take the mill level 3 course . or are you familiar with the courses? I was thinking I may not get much out of the level 1 course.
eMastercam - your online source for all things Mastercam.
Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.