Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.
Use your display name or email address to sign in:
Please help. We are trying to drill .013 dia. holes .25 deep in Carbon Carbon Phenolic. Using a .013 ball end mill at 30K RPM. .001 peck, .5 IPM. Any advice an feeds and speeds? Cauz it aint wurken.
Thanks Herk. The problem is not so much the length of the cut program; it is the repetetive posting of the main and sub programs. I only need a short main with "G22 L501 P2" The sub is also repeating for each repetition. I can fit the program for 2 parts in memory, but not for 12 parts. It is running now with a lot of cut and paste, but I'd like to post and go.
Ken,
The problem may be with drawing on the botom of the screen. Try drawing above center and change your c-plane to d+z-. This will change your G2/G3s.
Try creating a line at Z.1 that intersects your angled line. Then xform translate, copy, # of times, from the end of your line, to the intersection of the angle and the Z.1 line.
I,ve tried that. It still rapids from toolpath to toolpath, without stoping to rais the quill, if there is no change in Z. The post is not recognizing the different Z heights.
If you put a Z clearance of 2. in the first Op all toolpaths will have Z=2.
edmBosto,
Lars is right on the money. The only thing I can add, is the H91, H92 values will change every time you remove, replace, or change your diamond guides. Every time I touch a diamond guide, to change wire dia, or for cleaning, etc., the very next thing I do is wire allignment and taper Z. This habit will eliminate almost all taper errors. HTH
Keith
Any one out there programing an 2 axis Acu-Rite mill.
I have the post, but can't figure out how to work the Z positions. The posted code has the clearance height of the first Op. in every Op. thereafter. If the Z height does not change, the machine will not stop so I can raise the quill befor it rapids to the next Op.
Is this a post or operator issue?
I know it's a dead horse, but. I have a simple hemispherical mold cavity. Solid primitive block with a primitive sphere booleaned out of the top.
Surface Finish Flowline, with .00015 total tol. at 2:1. Scallop Height .0015
It takes 1.5 hrs to regen the toolpath! the run time is only 30 min.
Windoze XP SP2
Mem allocations are:
20,000
64,000
500
256,000
256,000
Is this normal for the tight tol. or is there a known conflict with one of the windows updates I.S. keeps force feeding us on a weekly basis?
Please help.
Thanks,
Keith
eMastercam - your online source for all things Mastercam.
Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.