Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

J Coulston

Verified Members
  • Posts

    638
  • Joined

  • Last visited

Everything posted by J Coulston

  1. Here is an example. N767 G90 N768 M29 S1500 N769 G95 <----- N770 G98 G84 Z-.05 R.33 F.025 N767 G90 N768 M29 S1500 N769 G94 <----- N770 G98 G84 Z-.05 R.33 F2.5
  2. MasterCam displays IPM. You are looking for IPR, both are correct. I will depend on your post as to what is output. G95 IPR F.025 Preferred method for tapping G94 IPM F2.5 If you are running X4 the parameter tool tab will show both IPM and IPR. Feed Rate and FPT.
  3. GoTo My PC works well, you can get a 30 day trial. Once your trial expires, wait if you want to sign up they will keep emailing you asking if you want to sign up each time at a lower price. Signed up for a year think they started at 16.00 a month came down to I think 9.00 month.
  4. X4 parameter dialog delay Same on XP64 and XP32 bit machines.
  5. Ooo no, this will end up being one more sticky.
  6. My cross hairs disappear, but the windows arrow pointer replaces it. If you have a different pointer selected in windows try the default pointer?
  7. werk 2x19" dells 1600 x 1200 home 2x19" viewsonics 1600 x 1200
  8. Could you be copying moving to a hidden level?
  9. Has anyone notice a delay with the new interface? From the time the Parameters icon is pressed until the 2D Toolpaths page opens it takes my system 2-3 seconds. It is killing me slowly . I noticed it in X3 on the high speed tool paths.
  10. The Fanuc based machines I own have parameters that store which tool is in which pot. I have had the parameter get screwy a few times during aborted tool changes, reset, power outage, ect. Try scanning thru you parameter list until you find where the tool locations are stored. You should be able to switch the two tools there. I dont even know what a seicos control so no help there. HTH
  11. Just bumped a holder, scrapped a part and collet because of this in a re-machine operation. if mr1$ = 2, #AI-NANO 2, AI(nano)CC output (Artificial Intelligence Contour Control) - G05.1 Q1 [ #pbld, n$, *sg49, e$ <------ commented out this line #Must be in G49 and remain before G43 if ipr_type > 1, ipr_type = 0 #Must be in G94 pbld, n$, sgfeed, e$ pbld, n$, "G05.1", "Q1", [if mr2$, "R", no_spc$, *mr2$], e$ #Mr2 gives accel/decel value/coefficient, usually R or P Seems ok whit the G49 commented out so far but only ran a few programs thru it.
  12. Bump Anyone? Thought we were in a recession?
  13. PH Horn They have a video of running. HTH
  14. 1,000,000 SW seats cant be wrong. One millionth license of SolidWorks software
  15. We run the whole range, RF communication, medical, military, aftermarket auto, weapon components, RF sealing and trimming dies, custom instruments.
  16. Is C-plane checked on the Chaining dialog box?
  17. Spring Carlisle was last weekend, gets crazy, but get to see a lot of nice hardware. Funny how kids do that.
  18. Hi Everyone, I am looking for a mill programmer/set up person preferably with job shop experience. We are ISO9000 registered. We Run MasterCam, SolidWorks and JobBoss. We run Mori Seiki equipment(except for one older no name vertical), 2 NL SY lathes, 1 NH HMC, 1 Dura vertical. We just installed a new Zeiss CONTURA G2RDS XXT 7/10/6 CMM. We machine a lot of aluminum and plastics some SS and pre-hard materials. We are located a half hour south west of Harrisburg, PA. My email is in my profile. PS don't look at the website it is nine years out dated. I am currently having a new one professionally built and should be up in the next month or so.
  19. We have a Dura5100 has been a great machine. We were looking to add a second one but bought a CMM instead. Here's a quote from December for a new DuraVertical 5100. DuraVertical 5100 MORI SEIKI CNC Vertical Machining Center With MSX-701 MAPPS Control Standard Features include the following: • CT#40 Spindle Taper • 10,000 RPM Spindle • 53.1” x 23.6” Table Surface • 41.3” x 20.9” x 20.1” Travels • 1,417.3 IPM Rapid Traverse Rates X, & Y • 787.4 IPM Rapid Traverse Rates Z • 20/17.3/15 Horsepower Spindle Motor • Spindle Cooler and Oil-Air Lubrication System • Coolant System, Complete Covers • 30 Tool ATC • 1.3 Second Tool Change Time (tool to tool) • 4.0 Seconds Chip to Chip DuraVertical Standard Machine Base Price $ 119,900 CBR Page 2 DuraVertical 5100 Standard Machine Base Price $ 119,900 Machine Options: Installed on STOCK machine • Thru Spindle Coolant Interface (DIN Style) $ 4,500 • High Speed Skip Function $ Included • Touch Tool Setter, Table Mounted $ 3,500 • Chip Conveyor $ 6,100 Total Investment Required $ 134,000
  20. I run GoTo MyPc as well works great. Very minor graphics or speed issues, runs dual monitors. I dont ever forget thumb drives or SIM. Not that any normal person would but I have used it while on vacation 5 states away. For $8.25 a month, it cant be beat. Try the free thirty day trial. I waited to sign up after the trial and every few days Gotomypc kept sending me emails with the new lower best price. Paid 99.00 for the whole year.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...